Showing posts with label windows. Show all posts
Showing posts with label windows. Show all posts

Renovation- Week 8

Monday 19 August 2013

The house has been a hive of activity this week with more framing and cladding by the builders and the painters starting on site.  We had a co-ordination meeting with the builder and cabinet maker to discuss the finer details of our kitchen and study.  I'll have to share the plans with you in another post.  I am so excited about this space!  We also met the electrician on site to finalise our power and lighting plans.  Meanwhile, I'm wishing Pottery Barn would start selling their lighting in Australia.  It's very difficult to source the gorgeous lighting in the images I have pinned on Pinterest.  And I'm not sure that I want the drama of importing and converting lights from the U.S.  

I have been out and about visiting lighting stores and plumbing suppliers to confirm our selections.  Having Master H and Miss O along for the trip always makes for an eventful visit!  We still need to settle on tiles for the ensuite but I think I have had enough for one week!

Painters have primed the timber doors and posts.

Flooring added ready for tiles in the ensuite
and pine flooring in the robe and retreat area.

Our old bedroom door removed and framed up
for the ensuite wall.

Framing for the main wardrobe in our master bedroom.
A new doorway cut in the hallway wall.


Framing for the guest bedroom.


Master H's bedroom door will be repositioned
to the new hallway and a robe will be on this wall
of the guest bedroom.

The hallway framing extended into the living area.
The study cabinetry will be on the left and kitchen on the right.


Chamfer boards added to the BBQ and bench area.
Battens added to the ceiling ready for VJ lining.

More ceiling battens and the primed door and windows in the living area.

Cladding complete on the bathroom wall.  Primed windows.


Cladding on the laundry/kitchen cupboard.

I must share our paint colour selections too.  Good bye poo brown and heritage green, maroon and cream! 

Renovation- Week 7

Tuesday 13 August 2013

This week saw the installation of the remaining windows and more chamferboards to the exterior of the house.  We're still eagerly awaiting the delivery and installation of the front doors.  I can't wait to see the house after its facelift! 
 
New windows for the guest bedroom.
 
Loving the new windows in the retreat area and ensuite.

 
The new look for the Eastern side of the house.
Window replaced in the bathroom and
chamferboards complete on the extension.
The Western wall.

Chamferboards complete on the Western wall.
As I mentioned in our week 3 and week 4 updates, we have been unsure about the western wall of the deck.  Originally we planned to have a full-height wall and were uncertain how to finish the internal side.  We have now decided to lower the wall to allow a small splashback above the outdoor kitchen/laundry bench.  We can add shutters or a blind if necessary.  
Wall lowered for an open side to the deck above the laundry/BBQ.
The rear view of the house.

I must admit that I'm getting a little overwhelmed with all of the decision making at the moment!  I thought we had specified heaps of items but there are still so many little details to consider and I don't want to get them wrong.  I really appreciate your feedback and suggestions. 

Renovation- Week 6

Friday 9 August 2013

Our week 6 update is a little late as my internet access dried up.  I was relying on the 1.5Gb of data per month included with my mobile phone plan as my wi-fi connection for the laptop and iPad.  And it turns out that doesn't last long!  Especially with Master H downloading Peppa Pig on YouTube!  Just as my internet withdrawal symptoms started to set in, Hubby M got us sorted by increasing our mobile plans. Anyway, enough about my first world problems and on to the progress at the house.

Our master bedroom started to take shape with the removal of the verandah wall.  I'm really looking forward to the addition of a retreat area, walk-through robe and ensuite in the verandah area.  We won't know ourselves with all that space!


The verandah wall and hallway wall removed
from Miss O's bedroom to create our master bedroom.

Three windows on the retreat wall will let in the beautiful morning sun.

The view from the walk-through robe. 
Recycled pine floorboards from our kitchen/dining area will be used on the verandah.

The new wall frame was erected to divide
Miss O's bedroom and the hallway.
The scaffolding was removed to reveal the house's new look.  The facade changed even more with the framing for the new front door and french doors for Master H and Miss O's bedrooms.  It was very exciting to see the new double hung windows and sliding door installed in the living area.
Bye-bye scaffolding!

Frames for new doors.  Insulation to be
added and walls re-lined with VJs.

Hello, beautiful new windows!

I'm glad we changed to a sliding door instead of the bi-fold.   

I think the fixed panel of glass is a better option than the doors
protruding onto our wide but shallow deck.
  
The builders have begun cladding the exterior walls with new chamferboards.
It won't be long now until we are at lock-up!