It's time to sell off all of our old doors and windows.  We will be listing the items elsewhere but I thought I would give any renovators following the blog the first opportunity to grab one of our pieces.  Please share this post with anyone you think might be interested.  Of course all items are in Brisbane and sold as is.

760x1940mm


1 of 3 - 810x2010mm


815x2025mm

4 available 620x2340mm

1030x2050mm

740x2070mm

1005x2125mm


My favourite door!  Wish we could have used this somewhere.  :-(  930x2090mm


2 of 3 810x2010mm

3 of 3 810x2010mm


6 - 515x1040mm and 2 - 460x900mm


1200x600mm

5 sets - 900x1500mm overall

Renovation- Week 13

Friday, 27 September 2013

I think I have the renovation blues this week.  Combine a severe case of decision fatigue (Ref.-Bungalow Girl), returning to work, no daycare placement for Miss O, a heat wave with all of my summer clothes packed away in the shipping container, 3 out of 4 of us being sick plus a couple of disappointments on site and I'm left feeling very weary!  But seeing our front door handle installed was a reminder that it won't be much longer before we return to our home and our life returns to normal.


Much of this week involved the builders completing the sheeting, adding the mouldings and installing the wardrobes.

New VJs for the guest bedroom wall.
 
Miss O's Bedroom door frame.

Miss O's Wardrobe.

Master Bedroom Robes and Ensuite.
 
The ensuite was lined ready for waterproofing, the installation of the vanity and tiling.  I am really looking forward to seeing the hexagon marble mosiac tiles laid.  This week I decided on some wall sconces that will look great above the vanity.

 



The retreat area windows have also been trimmed nicely to frame some more wall sconces.


The final cabinets were added to the kitchen so it is now ready for the benchtops to be installed.


For now I will dream about the house being complete and enjoying this lovely family living area.
  

Renovation- Week 11

Tuesday, 10 September 2013

The interior is starting to look complete with the addition of mouldings this week.  140mm skirting boards and 93mm architraves set off the windows and VJ walls beautifully in the extension area (kitchen, study, dining and lounge).  The ceilings are 3.2m high so the picture rail breaks up the wall nicely and will act as a crown moulding above the kitchen and study cabinetry.
  

 


We decided to remove the dado rail from the guest bedroom (as it was the only room in the house that had one) only to discover a split in the VJs.  So new full length VJs will need to be installed.  At least we were able to add insulation to the western wall in the process. 



To allow the builders to finish the internal wall lining and mouldings we needed to purchase and install our wardrobe inserts for our main bedroom.  The plan is to have one main clothing robe in the bedroom and a walk-through shoe and accessories robe between the bedroom and ensuite.
 

We decided to use the Pax and Komplement products from Ikea.  They have a great online planner that allowed us to play with designs and create a product list before heading instore.  This made processing our order at 6:15pm (45 minutes before closing) with two hungry and tired little people in tow very helpful indeed!  We ended up with 45 boxes and Hubby M did an amazing job of getting them all into the back of the ute and into the house!
 
    
 

The painters are still working their magic on the exterior of the house.  The facade has been primed and is looking great.  Not long now until the brick work disappears and work begins on the ground floor.