Showing posts with label renovation. Show all posts
Showing posts with label renovation. Show all posts

Renovation- Week 7

Tuesday 13 August 2013

This week saw the installation of the remaining windows and more chamferboards to the exterior of the house.  We're still eagerly awaiting the delivery and installation of the front doors.  I can't wait to see the house after its facelift! 
 
New windows for the guest bedroom.
 
Loving the new windows in the retreat area and ensuite.

 
The new look for the Eastern side of the house.
Window replaced in the bathroom and
chamferboards complete on the extension.
The Western wall.

Chamferboards complete on the Western wall.
As I mentioned in our week 3 and week 4 updates, we have been unsure about the western wall of the deck.  Originally we planned to have a full-height wall and were uncertain how to finish the internal side.  We have now decided to lower the wall to allow a small splashback above the outdoor kitchen/laundry bench.  We can add shutters or a blind if necessary.  
Wall lowered for an open side to the deck above the laundry/BBQ.
The rear view of the house.

I must admit that I'm getting a little overwhelmed with all of the decision making at the moment!  I thought we had specified heaps of items but there are still so many little details to consider and I don't want to get them wrong.  I really appreciate your feedback and suggestions. 

Renovation- Week 6

Friday 9 August 2013

Our week 6 update is a little late as my internet access dried up.  I was relying on the 1.5Gb of data per month included with my mobile phone plan as my wi-fi connection for the laptop and iPad.  And it turns out that doesn't last long!  Especially with Master H downloading Peppa Pig on YouTube!  Just as my internet withdrawal symptoms started to set in, Hubby M got us sorted by increasing our mobile plans. Anyway, enough about my first world problems and on to the progress at the house.

Our master bedroom started to take shape with the removal of the verandah wall.  I'm really looking forward to the addition of a retreat area, walk-through robe and ensuite in the verandah area.  We won't know ourselves with all that space!


The verandah wall and hallway wall removed
from Miss O's bedroom to create our master bedroom.

Three windows on the retreat wall will let in the beautiful morning sun.

The view from the walk-through robe. 
Recycled pine floorboards from our kitchen/dining area will be used on the verandah.

The new wall frame was erected to divide
Miss O's bedroom and the hallway.
The scaffolding was removed to reveal the house's new look.  The facade changed even more with the framing for the new front door and french doors for Master H and Miss O's bedrooms.  It was very exciting to see the new double hung windows and sliding door installed in the living area.
Bye-bye scaffolding!

Frames for new doors.  Insulation to be
added and walls re-lined with VJs.

Hello, beautiful new windows!

I'm glad we changed to a sliding door instead of the bi-fold.   

I think the fixed panel of glass is a better option than the doors
protruding onto our wide but shallow deck.
  
The builders have begun cladding the exterior walls with new chamferboards.
It won't be long now until we are at lock-up!

Renovation- Week 5

Monday 29 July 2013


Week 5 and we're still alive...  only just.  It has been a huge week!  Hubby M camped out in Master H's room packing what seems to be a never-ending supply of remaining items in the house and continued searching for a property for us to rent until October. 

My time away with Mum in Emerald was cut short due to illness. My poor sister became critically ill and was hospitalised. Her three children came to stay at Mum's making it a very full house. Then I also became unwell and decided it was time to head home.  Fortunately Hubby M had found that a family friend was away on holidays and happy to rent out his house immediately. Hubby M flew to Emerald on Saturday morning and drove us home on Sunday. Seeing the amazing progress on the house instantly lifted my spirit and gave me the energy to move in to our new temporary home that night. Here are some pictures. Please excuse the poor quality. I'm limited to the iPhone and iPad for photography and blogging at the moment!

Old balustrades removed to make way for new ones

Sleep out wall lining stripped. This will be the ensuite and walk-through robe. 


Sleep out ply wall lining stripped showing us that the two side doors were in fact once windows by the sill check outs in the studs. No paint on the VJ's or rafters is an interesting find.

Wall framing for the end of the ensuite. 

Roof trusses delivered. 

Hip roof taking shape. 
Three days from truss delivery to finished roof including new roof and gutters to the entire house!

The view from under the roof trusses. Insulation blanket to the underside of the roof sheeting and ceiling bats should keep things cool. Some of the AC duct temporarily located in in the ceiling before the roof sheeting went on.


New zincalume roof with 'monument' coloured gutters and gable roll. 

Balustrades demolished and insulation blanket under the roof sheeting. 


Robe wall and ensuite wall. 

Miss O's bedroom wall and door removed to open up the bedroom into the old hallway. 
The wall with the window will also be removed to extend what will become our master bedroom out into the verandah area. 

Our bedroom door removed and the centre hall marked out. 

The centre hall will cut through our current bedroom. 
The view from what will be our new front entrance. 

Partially demolished wardrobe from our bedroom. 
This will become Miss O's bedroom. 

Let's hope for a week of good health and that we settle quickly in to our new home. I'm exhausted!

Renovation- Week 4

Wednesday 24 July 2013

As the builders continue to progress at a rapid pace our days of living in the house are numbered.  It won't be long until work begins inside the existing house and it would be good for the builders to have the option of working indoors with all of this wet weather.   It was also timely to have my Mum's 60th birthday this week so I decided to pack up the kids and drive to Emerald to surprise Mum.  We will stay here for a couple of weeks while Hubby M bunks down and finishes packing up the last contents of the house.

Enjoying sunny and warm Emerald.

It was a huge effort to sort and pack the items that we would need not only for the next two weeks in Emerald but for the next 3 months until the house is completed.  Add in two sick children, a kindy open day, more rain and a 14 hour drive to Emerald and it was a hectic week with very little sleep.  Of course it rained the day that Hubby M needed to move the remaining large items out of the house!  Fortunately he had the help of some lovely friends and relatives and many hands made light work.


Hubby M's efforts to combat the mud and rain.
At least the excitement of our back deck kept us motivated.  We're really happy with the addition of the balustrades and valance.  I just can't wait to remove the garden shed and plant a lovely tree in the back corner of the yard!


  

The wall frame on the western wall will be extended up to meet the bottom of the valance rather than have a gap between the two.  I hope this is the right decision.  I'm still undecided on whether to line the inside of this wall with FC sheet or chamferboard.



The scaffolding arrived and reinforced that it really was time for me and the kids to move out!  I'm still not sure where we will live when we return from Emerald. Any suggestions of a fully furnished apartment we can rent for a couple of months in Brisbane???



 

Flashback Friday- Family Home Number 2

Friday 12 July 2013

In 2006 we took the opportunity to upgrade from our first home to a property closer to the city.  We purchased a lovely little Queenslander from its original owner.  The house was very much showing its age and in need of a makeover!  The house is located in a DCP (Demolition Control Precinct) so any plans had to meet specific guidelines to maintain the character and architectural style of the home and be approved by Council.  And while the house was on a 579sqm block it was subject to the Residential Design Small Lot Code because it had an average block width of less than 15 meters.  We stayed on in our first home and left the house unoccupied for 6 months while we planned our renovation with a builder.    


Our first goal was to relocate the one and only toilet from a cupboard (on carpet!!!) in the second bedroom and close off the tiny opening allowing access from the kitchen.


What were they thinking?

Other than that, there were no major surprises or issues to deal with.  We chose to open back up the front verandah that had been enclosed at some point and close off the side sleepout to create a third bedroom or study.  We removed the wall that separated the living room from the kitchen and dining areas and added a back deck and new rear stairs.  It was an expensive exercise to replace all of the aluminium windows with traditional timber double hung windows but well worth it.  We saved money where we could by opting to paint the interior (never again!), replace the battens under the house, erect a garage and fences plus landscape ourselves.  We organised our own contractors to paint the exterior, do the tiling and polish the floors to make more savings.  It was a busy three years of hard work but we were more than happy with the results.











We completed the landscaping just as I became pregnant with our first child.  Perfect timing to relax and enjoy our family home!  But then we spotted the 'For Sale' sign on a house a few doors down the street...  and as if welcoming our first child into the world wasn't enough to worry about, we purchased another property and listed our home for sale.  I must say it was interesting having real estate agents visit us at the Mater Mothers Hospital to sign contracts and breastfeeding in the car while our house was open for inspection!  We negotiated a 60 day settlement on the sale of our house so that we had this period of time to renovate the new house up to a liveable state for Baby Master H.  Looking back, I don't know how we survived!  We were crazy to inflict this upon ourselves but I'm glad we secured a great property.
  
4 week old Master H and our Family Home.